Endgame Airport
Long Range towers, double jetbridges, and 200-capacity terminals.
Last updated:
Endgame Airport Guide
Endgame in Itty Bitty Airport is not a credits roll — it is the moment Airbus A380 ($95,000 per landing) and Concorde Jet ($85,000) share your Long Range ATC Tower airspace while 200 indoor tiles hum with passengers. Taco Dev’s BETA tycoon (~35 Robux) saves its flashiest systems for players who mastered capacity, jetway pathfinding, and the $400,000 Long Range upgrade.
Endgame definition
You have reached endgame when:
- Long Range ATC Tower (Level 8) operational
- 200 capacity indoor terminal
- Large Runway + Double Jetbridge gates
- Concorde (120 cap) and A380 (200 cap) landing reliably
- Layout optimized for taxiway routing
Still collecting? See how to get all planes.
The Long Range ATC investment
Long Range ATC Tower unlocks at Level 8 for $400,000.
Required for:
- Concorde — 120 capacity, Double Jetbridge
- Airbus A380 — 200 capacity, Double Jetbridge
Full ATC progression: ATC towers — Small → Medium → Large → Long Range
Fund via Boeing 747 ($70,000) farming — how to get money
Capacity: the 200-tile grind
1 indoor floor tile = 1 capacity. A380 demands 200.
Planning tips:
- Modular 50-tile wings × 4
- Terminal design for multi-concourse
- Food and comfort adds tiles + income
- Verify: capacity calculator
747 at 150 tiles is the usual pre-endgame milestone — Boeing 747
Endgame plane requirements summary
| Plane | Cap | ATC | Runway | Jetway | Payout |
|---|---|---|---|---|---|
| Concorde | 120 | Long Range | Large | Double | $85,000 |
| A380 | 200 | Long Range | Large | Double | $95,000 |
Supporting fleet (777, Beluga, C-17) fills income gaps — planes hub
Layout strategies
Dual wide-body concourses
Separate Concorde and A380 gates with dedicated taxi spines. Remember: last placed jetway gets traffic — place active gate last per taxiway guide.
Central terminal hub
One mega-terminal with 200 tiles, multiple Double Jetbridges. Higher pathfinding risk — test extensively.
Proven templates: airport layouts
Monorail integration
Monorail and outside connects remote concourses without blocking taxiways.
Income optimization
A380 + Concorde rotation via jetway placement order
Minimize taxi time — more landings per hour
First Class Gamepass (320R$) — evaluate vs grind
Avoid layout rebuilds — expensive at this tier
Funding path without Infinite Cash
- Codes — $162k head start
- 737 / A320 mid income
- 777 → 747 ladder
- Save $400k for Long Range ATC
- Expand 150 → 200 tiles
- Deploy A380
Infinite Cash (1200R$) skips steps — tier list Gamepasses
Endgame troubleshooting
A380 won’t land at 199 tiles — off by one; add tile
Concorde ignores airport — verify Long Range ATC, not Large only
Planes stuck — path to last jetway blocked; planes not landing
Lag on mobile — mobile vs PC
Protecting endgame saves
Extra Save Slot Gamepass (125R$) — save and protect
Screenshot layout before BETA updates — release notes
Community endgame
Share layouts on Discord
No official Trello for roadmaps — Trello info page
Compare fleet ROI: tier list planes
Endgame balance as of Itty Bitty Airport BETA June 2026.